
Villa
Organize multi-storey spaces, common living areas, private rooms and furniture according to the overall architecture.
See detailsComprehensive solutions for houses, apartments, villas, offices and showrooms
GONOITHAT deploys synchronously from surveying the current situation, developing functions and perspectives to technical documents, estimates, production and construction. Each phase has clear outputs, approval milestones and inspection criteria for investors to monitor the scope, materials, progress and quality of completion. The project is accepted by category, handover of usage records and warranty applied according to the agreed scope.

The plan starts from the current status, usage and technical conditions of the project.
The steps of survey, design, estimation, production and construction have specific milestones and confirmations.
Architecture, interior design, engineering and construction are reviewed on the same set of documents to reduce conflicts.
Detailed drawings, material codes and finished dimensions are the basis for preparing components before installation.
The quotation must clearly describe the volume, materials, accessories, inclusions and adjustment conditions.
Acceptance documents, instructions for use and warranty help make interior operation more convenient.





Organize multi-storey spaces, common living areas, private rooms and furniture according to the overall architecture.
See details
Optimize area, storage and function within the structural conditions and existing technical systems of the apartment.
See details
Balance ventilation, light, vertical connection and living needs of each floor.
See details
Division of working, meeting, collaboration and operational support according to the number of people and the characteristics of the business.
See details
Design the flow of experience, point of view, display and lighting to clarify the product and brand identity.
See details
Organize customer service, operation, storage and maintenance functions for restaurants or commercial models.
See detailsComplete interior design and construction need to be managed with a unified flow of information, from user needs to structures that can be manufactured and installed. Thanks to that, investors can easily track decisions, scope and changes.
The process begins with a current status survey, needs analysis and functional floor plan approval. The 3D perspective is then developed so that decisions about scale, lighting, color and materials are informed.
Technical documents, estimates, production drawings and approval samples are the bridge between design and construction. Changes that affect functionality, cost or schedule should be documented before implementation.
Measure the current status, record technical systems, users, storage needs and expected scope.
Determine priorities for function, style, reference materials and the amount of investment that needs to be controlled.
Browse the layout first, then develop the spatial vision and key material choices.
Lock technical drawings, quantities, specifications, schedules, scope and change management mechanisms.
Fabricate components, prepare the site, install in sequence and check at important milestones.
Check by item, handle problems, hand over instructions for use and warranty conditions.

Villa
Area: Not yet announcedLocation: Not yet announced

Apartment
Area: Not yet announcedLocation: Not yet announced

Office
Area: Not yet announcedLocation: Not yet announced

Showroom
Area: Not yet announcedLocation: Not yet announced

Material samples, usage needs and layout options need to be discussed before finalizing the plan.

Interior details are reviewed along with current dimensions and related technical systems.

Custom-made components are prepared according to confirmed production drawings, materials and color samples.

The site is inspected according to the order, installation conditions and acceptance criteria of each item.
| Criteria | Process at GONOITHAT | Common risks |
|---|---|---|
| Current status survey | There are measurements, current status photos and records of related technical systems. | Wrong dimensions, missed construction conditions or detected conflicts too late. |
| Technical design documents | Shows size, elevation, materials, structure and release version. | Construction is based on different interpretations or only on perspective. |
| Quote and scope | There are weights, units, specifications, inclusions and adjustment conditions. | Difficult to compare, easy to miss items or argue when they arise. |
| Materials and material codes | Material codes, accessories, approval samples and replacement principles are recorded. | The finished product has a different color, different surface or does not meet the expected quality level. |
| Progress | The plan is linked to ground conditions, approval milestones and the order of work groups. | Teams wait for each other, components arrive at the wrong time or have to be redone. |
| Quality control | There are inspection points at the factory, before concealment, at installation and at completion. | Errors are only discovered at acceptance, when repair costs are already high. |
| Warranty policy | Indicate deadlines by category, reception and exclusions. | Responsibility unclear when there is an incident or damage due to use. |
| Production capacity | There is a process for approving production drawings, color samples, trial installation and packaging. | Components are inconsistent, in the wrong location or difficult to install at the construction site. |
| Field supervision | There is a point of responsibility, a log, and a change confirmation mechanism. | Fragmented instructions, lack of evidence or parties using different documents. |

Lock down the floor plan before developing visuals, materials and aesthetic details.

Choose based on usage conditions, surface finish, maintainability and budget.

Processing according to production drawings and approved samples before being sent to the construction site.

Install in order, check each item and complete handover documents.

Steps from survey and need determination to functional plan and perspective.

The criteria help compare the scope, materials and conditions of adjustment.

Consider function, usage environment, surface and maintainability.

Six key stages and milestones before moving forward.
One-to-one expert guidance
Leave your phone number and a GONOITHAT specialist will contact you to help choose an option suited to your needs and budget.